Tutorials

How does F-Predict build a forecast, step by step?

In shortEvery F-Predict forecast is built inductively from cited evidence. It starts from a market scope, gathers primary signals — runway looks, social conversation and cultural shifts — maps them to consumer emotions with the P2VP framework, derives colour from what the evidence supports, and scores confidence from the evidence itself. Industry forecasts are never used as an input.
Last updated 4 steps · about 5 minBy F-Trend
Where
F-Predict → Methodology, and any forecast
Steps
4
Time
About 5 min
  1. Step 1: The principle: no borrowed forecasts

    The F-Predict methodology page headed “Forecasts that show their work”, with the “We never read industry forecasts” statement.
    The F-Predict methodology page headed “Forecasts that show their work”, with the “We never read industry forecasts” statement.

    The public methodology sets the rule: no trend-agency reports or seasonal colour announcements go into the pipeline — not as input, calibration or sanity check. Every call is derived from primary signals, so agreement with the consensus is corroboration, and disagreement is information.

    1. The rule — industry forecasts are never an input.
  2. Step 2: From scope to scored forecast

    The six method steps: Scope, Evidence gathering, Emotion mapping (P2VP), Color derivation, Confidence scoring and Public scoring.
    The six method steps: Scope, Evidence gathering, Emotion mapping (P2VP), Color derivation, Confidence scoring and Public scoring.

    The method runs in six steps: Scope (start from a market, never from a colour), Evidence gathering (primary signals, each stored with its source), Emotion mapping with P2VP, Colour derivation (the palette is what the evidence supports), Confidence scoring and Public scoring, where seasonal calls are logged before the season and scored after it lands.

    1. Evidence gathering — runway looks, social conversation and visual signals, each stored with its source.
    2. Emotion mapping (P2VP) — signals mapped to 25 consumer emotions in 9 clusters across 3 groups.
  3. Step 3: See the measured basis in a forecast

    The measured-basis note in a forecast: Spring Summer 2027, 2,116 runway looks across 7 indexed seasons, and the scope fields it was counted on.
    The measured-basis note in a forecast: Spring Summer 2027, 2,116 runway looks across 7 indexed seasons, and the scope fields it was counted on.

    Every forecast states what it was measured on. Under the consumer map: Spring Summer 2027, 2,116 runway looks across 7 indexed seasons, womenswear — how far the target season sits from the latest observed one, and which scope fields the measurement was counted on.

    1. Measured basis — season, look count, indexed seasons and what the measurement was counted on.
  4. Step 4: Read confidence and citations

    The evidence basis of a colour forecast: confidence 75 with 14 citations, runway looks by house, social signals by platform and P2VP emotion drivers.
    The evidence basis of a colour forecast: confidence 75 with 14 citations, runway looks by house, social signals by platform and P2VP emotion drivers.

    On a colour forecast, Evidence basis shows the confidence score and citation count, then the evidence itself in three columns: the runway looks carrying the colour, the social signals by platform and the P2VP emotion drivers.

    1. Confidence and citations — a score computed from the evidence, never an opinion.
    2. Runway looks — the top looks carrying the colour, by house.
    3. Social signals — platform-by-platform readings.
    4. P2VP emotion drivers — the emotions the colour answers.

What you have now

You can trace any call in an F-Predict forecast back to the evidence and the step of the method that produced it.

Read the full methodology →

Frequently asked

Does F-Predict use trend-agency forecasts?

No. No industry forecast goes into the pipeline as input, calibration or sanity check. Every call is derived from primary signals — runway looks, social conversation and cultural shifts.

How is the confidence score calculated?

From the evidence behind the call: how much evidence supports it, how diverse the sources are, how recent the signals are and whether independent signal types corroborate each other. The score is a property of the evidence shown next to it.